FAST PAK VALUE 0997 SPRING TOGGLES – PACK OF 2

£0.65

In stock

Last updated on January 4, 2025 10:24 pm Details

SKU: KD02038 Category:
Report Abuse

How to Use FAST PAK VALUE 0997 Spring Toggles

Introduction

Spring toggles are used to secure fixtures to hollow walls or ceilings. Follow the steps below to use them effectively.

Tools Required

  • Drill
  • Appropriate drill bit (as per the toggle size)
  • Screwdriver
  • Pencil or marker
  • Measuring tape

Step-by-Step Instructions

1. Mark the Spot

  • Use a measuring tape to determine where you want to insert the spring toggle.
  • Mark the spot with a pencil or marker.

2. Drill a Hole

  • Select a drill bit that matches the size of the spring toggle.
  • Drill a hole at the marked spot.
  • Ensure the hole is clean and free of debris.

3. Insert the Toggle

  • Pinch the wings of the spring toggle together.
  • Insert the toggle into the drilled hole.
  • Push until the wings open on the other side of the hollow wall.

4. Secure the Fixture

  • Place the fixture over the toggle screw.
  • Using a screwdriver, tighten the screw until the fixture is secure.
  • Ensure the fixture is firmly in place.

Safety Tips

  • Ensure the wall or ceiling can support the weight of the fixture.
  • Wear safety goggles while drilling.
  • Do not overtighten the screw to avoid damaging the wall.

Conclusion

Using spring toggles is a simple and effective way to secure fixtures to hollow walls. Follow these instructions carefully for best results.

Be the first to review “FAST PAK VALUE 0997 SPRING TOGGLES – PACK OF 2”

Your email address will not be published. Required fields are marked *

Good quality.Good service.The product is firmly packed.Very fast delivery.Very well worth the money.

Reviews

There are no reviews yet.

Loading...

Product Location

Shortcuts

FAST PAK VALUE 0997 SPRING TOGGLES - PACK OF 2

FAST PAK VALUE 0997 SPRING TOGGLES - PACK OF 2